MDM Trouble Report for 2012 Nov 17 Telescope: 1.3m Observer(s): Wagner (OSU) Instrument: Templeton/Direct Problem(s) Encountered: Weather was cloudy so no time was lost. One leg of the UPS at the 1.3 m has failed. As a result the computers in the left 2 racks in the computer room as well as the monitors along the wall next to the door to the telescope are not operable. With Bob's help we plugged the computers in the left two racks into an adjacent rack and the wall instead to return to operations. These computers are currently on unprotected power until the UPS is fixed. ------------------------------ Submitted on 2012 Nov 18 [3:22:48]