MDM Trouble Report for 2018 Feb 26 Telescope: 2.4m Observer(s): John Thorstensen (Dartmouth) Instrument: Modspec + Echelle Problem(s) Encountered: Had to restart the MIS one time when the guide probe refused to budge in X. More interestingly, the TCS started running very slowly at the end of the night. I restarted the bridge program (which is erroneously called tcsbridge in the manual) but it was still slow. Windows were taking a while to paint; coordinates had to be sent from JSkyCalc several times before they registered. I have no idea whether it's only the prgram or whether there's a systemic problem with the computer. Since it was the very end of the night I didn't try to fix it. ------------------------------ Submitted on 2018 Feb 27 [6:51:07]