Appendix A: Startup Checklist
Observing Conditions
Dome.
- Open dome main shutter then the drop-out shutter (the E-stop must be disabled, red light off, for the dome shutter and drop out to work).
- Open and latch the dome exterior door.
Telescope & Instrument
- Open MIS dark hatch
- Leave the mirror covers closed until
ready to collect data, they are controlled via the TCS GUI.
- Fill instrument dewar with liquid nitrogen if required.
- Move the LN2 storage dewar, ladder,
etc. away from the telescope to the northeast corner of the platform.
- Lower
the moving platform all the way down. Interlocks will prevent
telescope motion if the platform is not fully down. This is indicated
on the TCS GUI.
Computers
- All Programs that are needed should be running,
Telescope Control System [this should be running but if not go to the link below]
New TCS Control System
Updated: 2016Jun06 (Galayda/MDM)